New Switchboard Installation | Hazardous Area Electrical Upgrade
Tazlec Group delivered a complete switchboard design, manufacture, and installation.
Project
Switchboard design, manufacture, and installation
Client
-
This project involved the removal, relocation, and upgrade of electrical switchboards and distribution systems to meet hazardous area requirements, improve reliability, and ensure compliance with Australian standards.
This project involved the removal, relocation, and upgrade of electrical switchboards and distribution systems to meet hazardous area requirements, improve reliability, and ensure compliance with Australian standards.
Scope of Works
Switchboard Removal & Decommissioning
Safe removal of existing electrical switchboards to enable site rezoning.Custom Switchboard Design & Manufacturing
Supply of a purpose-built electrical switchboard engineered for hazardous area integration.New Switchboard Installation
Installation and commissioning at the new designated location.800A Mains Supply Relocation
Relocation and reconnection of the 800 amp mains supply from Plant MCC to the new switchboard.Distribution Board Relocations
Lighting & Power Circuit Migration
Transfer of all required circuits from DB's to the new system.Electrical Protection Upgrades
Installation of:New MCCBs (Moulded Case Circuit Breakers)
Approx. 18 x RCBOs for final sub-circuit protection
Cable Rerouting & Underfloor Services
Optimised rerouting of circuits, utilising underfloor cable pathways where possible.
Project Outcome
The project delivered a compliant hazardous area electrical system, improving power distribution, circuit protection, and operational safety. Tazlec ensured minimal downtime, efficient integration with existing infrastructure, and a future-ready switchboard solution.